Phase 1 Factory Area


Phase 1 Factory Area

Building area

38,009.29㎡

Base area

57,702.00㎡

Factory floor area

35,467.76㎡

Office building floor   area

8,417.97㎡

Main Production and Manufacturing

Fabrication,   Assembly, and Welding of Upper Leg Arch Head

2D and 3D Assembly   and Welding of Upper Structures

Lower   Structure and Transition Phase Assembly and Welding

X-brace fabrication,   assembly and welding

2024世紀風電062.jpg